Quality Policy Statement
|
|
Masa Builder Sdn Bhd (MBSB) is committed to achieving
Quality Excellence in all aspects of its business process
and at all levels of operation.
|
|
|
|
MBSB believes Quality Excellence shall spearhead the
Company to achieve its Corporate Vision:
|
|
|
|
"To be a world class contractor in Malaysia and the
region, able to consistently meet or exceed clients'
requirements and to contribute for the nation development
towards the vision of 2020 through sustainable innovation
in the implementation of constructed facilities while
serving the society and the environment."
|
|
|
|
|
Quality Excellence shall form the corporate culture and
shall be cultivated through strategies outlined to achieve
the following Quality Policy:
|
| * |
Maintain and enhance MBSB's reputation as an
organization that provides quality construction and its related services that consistently meets
and exceeds internal and external client's requirements
|
| * |
Ensure full compliance on public interest,
environmental preservation, natural resource conservation and all regulatory bodies pertaining
to our construction works.
|
| * |
Continuously improve all functions within the
organisation through training, innovation and creativity.
|
| * |
Develop and implement an effective Quality
Management System based on ISO 9001:2000 |
|
|
|
|
It is MBSB's goal to extend the awareness, acceptance and
implementation of the quality system to all our
sub-contractors, consultant and suppliers.
|
|
|
|
Each personnel is required to actively promote and
implement this policy in all area of activity for which
they are responsible.
|
|
|
|
|
Safety and Health
Policy Statement
|
|
Masa Builder Sdn Bhd (MBSB) has a responsibility and
commitment to assure that all the employees work in a safe and healthy
environment. It is, therefore our duty to take every reasonable step as
far as practicable to comply with all applicable safety and health laws
and regulations to prevent job related injuries and illness.
|
|
|
|
It is our policy to:
|
|
|
|
1)
|
Provide and maintain
a safe and healthy working environment for all of our employees
and general
public.
|
|
2)
|
Develop and enforce
the use of safe working practices and comply with all safety
regulations.
|
|
3)
|
Provide necessary
information, instruction and training to all employees.
|
|
|
|
|
Every employee plays an important part in our Safety
and Health Programme in achieving the above objectives. Therefore, it is
the duty of each level of employees to:
|
|
|
|
-
|
Co-operate with
Management on the discharge of any duty imposed by legislators
relating to Safety
and Health.
|
|
-
|
Comply with any
instruction or measure in Occupational Safety and Health
instituted by the Management.
|
|
|
|
|
It is the intent of the company to enforce strict
compliance with all established safety and health standards for everyone
associated with this Project and to actively pursue all avenues available
to make it an "ACCIDENT FREE" Project. |
|
|
| Environment
Management Programme |
|
| The
primary objectives of the EMCP are as follows: |
|
| * |
To
ensure that MBSB and its subcontractor
comply with the environmental
requirements of the Client and the DOE
as spelt out in the EIA approval
conditions and other document; |
| * |
To
establish a documented Environmental
Management System (EMS) for MBSB to
effectively mitigate against potential
environmental impacts during the
construction phase; |
| * |
To
provide the means to ascertain the
effectiveness of environmental
protection/conservation measures
identified in the EIA study which will
form the basis for additional/modified
provisions to meet stipulated limits
where these are expected; and |
| * |
To
ensure that the works carried out
comply with legislative requirements
stipulated by other
agencies/department and in meeting the
overall objectives of the projects. |
|
|
| The
EMCP provides control measures for the
following environmental threat: |
|
| * |
Erosion
and sediment |
* |
Solid
waste (non-scheduled) |
| * |
Water
pollution |
* |
Scheduled
waste |
| * |
Air
pollution |
* |
Traffic
and transportation |
| * |
Noise
and vibration |
* |
Social
control |
|
|
| Audit
and inspection programme shall be developed in
order to assess the effectiveness of the EMCP.
The environmental audit will encompass the
following activities: |
|
|
*
|
Inspections of construction activities
on site to ensure mitigation measures are
properly and effectively implemented;
|
|
*
|
Review the adequacy of the implemented
mitigation measures. Additional
mitigation/remedial measures, changes in
working practices etc. will be recommended as
necessary (in the case of non-compliance with
environmental performance limits or
identification of adverse impacts) to ensure
that the project environmental objectives are
achieved;
|
|
*
|
Inspections and monitoring of specific
activities, such as noise generated from
"noisy" equipment or movement of
trucks;
|
|
*
|
Assessment of the effectiveness of the
environmental problems and impacts
|
|
* |
Assessment of the effectiveness of the
environmental management system, practices and
procedures;
|
|
* |
Identification and anticipation of any
environmental problems and impacts that may be
encountered in the near future, and
determination of appropriate solutions; and
|
|
* |
Investigation of any complaints from
residents/sensitive receivers/neighbouring
installations and the actions taken when
complaints are received.
|
|
|
| The EMCP covers the
following topics: |
|
| * |
Project Background |
* |
Monitoring and Auditing |
| * |
Compliance Requirements |
* |
Reporting |
| * |
Pollution Control Measures |
* |
Records |
| * |
Emergency Preparedness and Responses |
* |
Roles and Responsibilities |
|
|
|
|
|
|
|